Site Logistics Plan – Use Bluebeam
OBJECTIVES: Prepare Site Logistics Plans for the NAU SAS Building for the different stages of the project as follows: – Site utility, earthwork and caisson drilling – Superstructure erection – Building enclosure – Interior Finishes & Building Services
This is a company assignment. All team members shall contribute to the different aspects of the Site Logistics preparation and brainstorm ideas and solutions together. You need to submit a list of the different tasks you assigned to each team member and indicate who worked on which site logistics plan. The purpose of this assignment is for you to demonstrate your abilities to apply site logistics knowledge gained over previous classes during your time in the CM Program.
INSTRUCTIONS: *****ONLY CHOSE ONE STAGE****** I prefer Site utility, earthwork, and caisson
Step 1: Review your schedule and the main activities, along with the project’s scope of work, and decide what stages of construction will require a change in site logistics plan.
You will need to provide a site logistics plan for each stage.
Consider the following:
Site utility, earthwork and caisson drilling
Superstructure erection
Building enclosure
Interior Finishes & Building Services
Step 2: What items will you need to show on your site logistics plans? Consider the following at a minimum:
Overall location of the project
Site fencing
Workers access to the jobsite
Visitors access to the jobsite
Equipment & Materials delivery access to the jobsite
Emergency Access for First Responders (Fire Department, Police)
Location of jobsite trailer
Location of First-Aid
Temporary Utilities
Location of any means of loading/unloading (cranes)
Step 3: Using a computerized tool of your choice, prepare a graphic representation of your Site Logistics plan for each stage of construction.
Leave a Reply
Want to join the discussion?Feel free to contribute!