Captone Project for the Design HVAC and Plumbing Systems for a Building

Capstone Project for Mechanical Design 
This is an engineering design paper
Captone Project for the Design HVAC and Plumbing Systems for a Building 

  •  Design HVAC and plumbing systems for building.
  • Challenges:
    -Building will require 2 different HVAC Systems
    -Commercial kitchen

In addition to the above, you can also get Mechanical Designs for the Build Environment for the following services:

  • Internal plumbing and drainage
  • Water tanks
  • Water distribution
  • Air conditioning & Refrigeration
  • Mechanical Engineering (BS) ventilation
  • Petrol stations
  • Swimming pools
  • Water treatment
  • Boilers (steam and hot water services)
  • Kitchen equipment
  • Laundry equipment
  • Fire protection
  • Solar water heating
  • Liquefied Petroleum Gas installation
  • Compressed air installation
  • Medical gases
  • General maintenance of plant and equipment
  • Safety precautions
  • Preparation of Bills of Quantities
0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *