Question
A network consists of the following list. Times are given in weeks. (20 points)

Activity Preceding Duration
A 6
B A 4
C A 5
D A 4
E B 10
F B 8
G C,F 3
H D 3
I H 8
J G,I 6
K E,J 2

a. Draw the network diagram.
b. Which activities form the critical path?
c. How much slack exists at each activities?
d. What is the duration of the critical path?