Feasibility of Utilizing Solar Energy in Remote Households

Write a feasibility study about  Utilizing Solar Energy in Remote Households.
This is the outline:
Aim and objectives (250 words)
Impact statement (300 words)
Background (800 words)
Research program and methodology (500 words)
References

Opioids abuse in the community

Opioids abuse in the community
Write a 2,500 literature review on opioids misuse in the community.

Failure Mode Effect Analysis (FMEA)

FAILURE MODE EFFECT ANALYSIS (FMEA)
Write a 1,650-word paper in with the following outline.
Introduction
Types of FMEA
History of FMEA
Benefits of FMEA
Uses of FMEA
Reasons why FMEA is used
Critical Aspects of FMEA
Conducting FMEA
FMEA as a Tool for a Team
Procedure for Conducting FMEA

Market Structure and Financial Development

In 1,550 words, write n essay in which you discuss the relationship between market structure and financial development.
Cite at least 5 sources.

American International Group (AIG) Scandal

Instructions
You are given a case study of American International Group (AIG).
You are required to analyze the case study in the context of corporate ethics.
Create a good outline.
Format your paper in APA style. Write about 1,750 words. Cite six sources.

Carbon fiber reinforced composites (CFRC) in Automotive Industry

Write a 2,500 word paper in Harvard style in which you cover the following:

  1. Carbon Fiber Composites vs Traditional Metallic Material
  2. Advantages of carbon fiber reinforced polymers
  3. Effect of high production rates
  4. Competitive Nature of Composites in the Automotive industry
  5. Anisotropic Characteristic of Carbon Fiber Composites
  6. Supply of Pre-preg of Carbon Fiber Composites.
  7. Processing characteristics of carbon fiber composites

Structural Method for New Basement

Write a paper including the following:

  1. Advisory Report to the Architect describing your chosen method to construct the new concrete walled basement.
  2. Major mechanical plant
  3. Ground retaining  during basement excavation
  4. Chosen system to form-work the walls

Completing Masonry Bid Form

Complete masonry bid form provided.
Include the following:
00005  INTRODUCTION
00010  INVITATION TO BID
00100  INSTRUCTIONS TO BIDDERS
00300  PROPOSAL FORM
00500  OWNER-CONTRACTOR AGREEMENT FORM
00600  BONDS AND CERTIFICATIONS
00700  GENERAL CONDITIONS OF THE CONTRACT
00800  SUPPLEMENTS TO THE GENERAL CONDITIONS (RIDER)
00900  ADDENDA AND MODIFICATIONS
00950  CONTRACTOR NEGOTIATIONS
APPENDICES
0-1       INVITATION TO BID
0-2       PROPOSAL FORM

  • NON-LIEN AGREEMENT

Aboriginal Peoples and the Criminal Justice System, Canada

Answer the following questions.
Maximum word count in each question is 450 words.
Question #1
Many studies have shown that Aboriginal peoples are over-represented in the criminal justice system. Examine the statistics that demonstrate this over-representation, and identify and discuss at least three reasons for it.
Question #2
The view of justice that prevails in Canada derives largely from English legal concepts. The traditional views of Aboriginal people were quite difference. Describe each of these perspectives, discuss its strengths and weakness, and outline the process by which the current criminal justice system came to dominate in Canada. What has been the result for Aboriginal people?
Question #3
Generally, Aboriginal peoples have a strained relationship with the police. What is the historical basis for this situation? How does it manifest in contemporary society? What has been done to address this situation? And how successful were these effort? What else might be done to improve the relationship?
Format your paper in APA.

Natural Hazard Resistant Construction

Complete the City of Baton Rouge DPW Permit and Inspection Division Residential Plan Review Application Form (http://brgov.com/dept/dpw/inspections/pdf/PlanReviewApp.pdf) for a 2156 sf wood framed house with a cost of $120/sf at ONE of the following addresses located in Baton Rouge, LA.  Make sure to follow all the requirements shown on the back of the form:
1 – Application form
2 – Calculate permit fee
3 – Submit plot plan – submit a satellite map from Google, as well as a map from http://ebrmap.brgov.com/ebrgis/, along with the property details for your location.
4 – Flood Zone Determination Form – https://brgov.com/DEPT/dpw/inspections/pdf/FloodDetermination.pdf.  Fill out ALL parts of the form, even though the instructions do not require it.
5 – Proposed Certificate of Elevation – https://brgov.com/DEPT/dpw/inspections/pdf/ProCertElevation.pdf.  Fill out all parts of form (you can skip contractor, etc.).  You likely will not know Record Inundation – please leave blank.
You may leave owner information, etc. blank.
Calculate the approximate flood insurance cost for YOUR ADDRESSS or another address (you can use one of the below) for building and contents (www.floodsmart.gov – do the One-Step Flood Risk Profile (in red) and enter the property information).  If it returns “contact agent”, please just indicate this.
9121 Parkway Dr.
8635 Norfolk Dr.
10121 Oliphant Rd.
10811 Landsbury Ave.
OPTIONAL:  Complete the above assignment for an alternate location you select INSIDE or OUTSIDE Baton Rouge.  You may use either the Baton Rouge forms (links provided above) or use the forms in effect for the jurisdiction you select.
To complete Assignment 2 – complete all aspects above and compile the Plan Review Application Form (you can fill out by hand and scan/take picture), the plot plan, Flood Zone Determination, Proposed Certificate of Elevation, and approximate flood insurance cost into ONE pdf (LASTNAME_A2.pdf) and upload to Moodle by Sunday of Week 3 at 11:55 pm.
See Next Page for Assignment #3
CM 7250 Natural Hazard Resistant Construction
Assignment #3 – Project Part 1 – Location and Scope
Project Description – For your comprehensive project for the semester (worth 40% of your grade), you will develop a building/facility concept in which you will address the “hazard-resistant” design and construction considerations.  The project is introduced in Week Three: Instructor Video at 6:40.  Please refer to this video for more description.
The building/facility can be located anywhere that U.S. building code applies (we will use the IBC/IRC, and other additional, applicable code requirements you would like to explore) and must be subjected to at least 3 hazards – code-specified (e.g. wind, flood, seismic, rain, snow) or non-code-specified.  Likely any location will be subject to 3 hazards, so if you need some guidance about your location, please contact me.  There will be 3 assignments that guide you through your project.  This is the first assignment, and requires that you locate your building/facility, provide an overview of the scope, and look up code-specified hazard parameters.  If you have questions about the scope of the project, please post these to the Q&A Forum.
Project Part 1 – For your project building/facility, please answer all the questions below as completely as possible (if not applicable, please specify N/A).  You may use this word document as a template to provide your responses, or use another format if you wish.

  • What is the use of your building/facility? Be as specific as possible
  • Where will your building be located? Provide lat/long coordinates (should be able to find location based on this) and satellite/aerial image-based maps (as needed) to describe the project location.
  • What is the general configuration of your building/facility? Square footage, number of stories, etc.
  • What are the primary building materials that will be used – structure, cladding (we will revisit dead loads later)?
  • What are the general design loads you need to consider based on quick review of building code?
    • Residential (2012 IRC) http://www.madcad.com.libezp.lib.lsu.edu/library/138093/369776/ – develop and complete a table similar to Table R301.2(1) Climatic and Geographic Design Criteria using the maps and data found in this section of the IRC.
    • Non-Residential (2012 IBC)
      • What is your Use and Occupancy Classification? What is your Risk Category? (http://www.madcad.com.libezp.lib.lsu.edu/library/IBC-12/, Chapter 3)
      • Review components of Chapter 16 (Structural Design) and provide numerical responses to describe code-required loads for:
      • live loads – based on use and occupancy of the building, what are the live loads? Do they differ throughout the building or are they constant?
      • snow loads – look up the design ground snow load, pg
      • wind loads – look up the design wind speed for your Risk Category
      • rain loads – look up the 100-year, 1 hour rainfall
      • earthquake loads – look up the ground acceleration parameters (use USGS site from Week 2, Assignment #1)
    • What is your FEMA FIRM Flood Zone (msc.fema.gov)? What is the significance of your flood zone (i.e. what does it mean)?
    • What is your Base Flood Elevation?
    • What is your Design Flood Elevation?
    • Provide the link to the State Hazard Mitigation Plan relevant to your project. For Louisiana, it is http://www.getagameplan.org/mitigateplanupdate.htm.  Read/skim the risk assessment section (Louisiana-http://gohsep.la.gov/mitigation/2014SHMP/Section_2.pdf) and detail the most significant hazards that have the potential to impact your project.